Turnaround & Outage Housing

Freeport Plant Turnaround Housing

Monthly and weekly RV sites for contractors working scheduled outages, turnarounds, and maintenance shutdowns at Dow, BASF, Shintech, Freeport LNG, and Port Freeport. 3–6 miles from the industrial corridor.

Monthly: $450+/monthWeekly: $250/weekDaily: $55/nightElectric metered separately

Why Contractors Book Austin's Landing for Turnarounds

Turnaround crews need housing that works around shift schedules — not against them. Austin's Landing enforces quiet hours 10 PM–8 AM, sits on concrete pads that stay level through coastal weather, and offers month-to-month stays with no long-term lease. When a turnaround runs long, you extend by the week. When it wraps early, you're not locked in.

Quiet Hours

10 PM – 8 AM enforced

Concrete Pads

Level in any weather

Free WiFi

Stream & video call

On-Site Laundry

No off-site trips

Per-Diem Cost Calculator

Estimate your total housing cost before you arrive. No hidden fees.

1 mo6 mo
$60 (mild)$150 (heavy AC/heat)

Cost Estimate

Base rate (4 months)$1,800
Electric (est.)~$360
Total estimate$2,160

Per-day housing cost

$18/day

Many contractors receive a per-diem allowance from their employer or staffing agency. Monthly rate ÷ 30 days = ~$15/day base housing cost — well within most per-diem budgets.

Base rate includes: full hookups (water + sewer), 30/50 amp service connection, free WiFi, on-site laundry access, concrete pad, and gated access.

Electric is metered separately — billed monthly at actual usage. Typical contractor usage: $60–$120/month depending on AC/heat load and season.

Freeport Industrial Turnaround Guide

The Freeport industrial corridor runs some of the largest petrochemical facilities in North America. Scheduled turnarounds and maintenance outages bring hundreds to thousands of contractors into the area — often with 2–4 weeks' notice. Here's what to know about each facility.

Dow Chemical Freeport Complex

Scheduled Maintenance Turnaround
3 miles / 7 min3–8 weeks typicalLarge (500–2,000+ contractors)
Season: Spring / Fall

One of the largest chemical complexes in the Western Hemisphere. Turnarounds draw contractors from across the country. Book early — monthly sites fill 2–4 weeks before mobilization.

RV housing details & drive times

BASF Freeport Site

Scheduled Outage / Turnaround
4 miles / 9 min2–6 weeks typicalMedium (100–500 contractors)
Season: Spring / Fall

BASF Freeport operates one of the largest integrated chemical sites in North America. Turnarounds are scheduled well in advance — confirm your mobilization date and book your site immediately.

RV housing details & drive times

Shintech Freeport

Scheduled Maintenance
5 miles / 10 min2–5 weeks typicalMedium (100–400 contractors)
Season: Variable

Shintech is the largest PVC resin producer in North America. Maintenance windows bring in specialty contractors for mechanical, electrical, and instrumentation work.

RV housing details & drive times

Freeport LNG Terminal

Scheduled Maintenance / Outage
6 miles / 12 min2–6 weeks typicalMedium-Large (200–800 contractors)
Season: Variable

Freeport LNG is one of the largest LNG export terminals in the US. Maintenance outages require specialized crews for cryogenic, mechanical, and safety systems work.

RV housing details & drive times

Port Freeport

Infrastructure / Construction Projects
4 miles / 9 minVaries by projectVariable
Season: Year-round

Port Freeport is undergoing ongoing expansion and infrastructure upgrades. Construction and marine contractor crews often need extended housing for multi-month project assignments.

RV housing details & drive times

Contractor FAQ

Everything a contractor needs to know before booking — rates, per diem, site details, and turnaround-specific questions.

Mobilizing for a Freeport Turnaround?

Call now to check monthly availability. Sites fill fast when a major turnaround is announced — don't wait until the week before mobilization.